Task #7379
closed
Create new VM for hosting SocialNetworking and gcube-oauth services
Added by Roberto Cirillo about 8 years ago.
Updated about 8 years ago.
Infrastructure:
Production
Description
The new VM should have the following capabilities :
- 2 vCPU
- 4 GB of RAM.
- the latest smartgears-distribution
these services will work on all scopes of production environment
In addition it is very important that this node has a postfix configured to send email by using the same SMTP Relay of the Gateways.
I suggest to call this host as:
socialnetworking-p-d4s.d4science.org
- Blocked by Task #7380: Provide the list of all scopes currently available in production environment added
There is no gcube-oauth role yet, is it correct?
- Status changed from New to In Progress
The IP address: 146.48.123.21
- % Done changed from 0 to 70
The playbook is almost ready. The missing parts are the scopes list and the gcube-oauth role.
The VM is up, ready to be configured.
We will add socialnetworking.d4science.org to the haproxy frontend, with the running VM as the sole backend. So if a need to put the service in HA arises we will only need to add other backends.
socialnetworking-p-d4s.d4science.org is going to be renamed socialnetworking1.d4science.org
I also have a haproxy configuration almost ready. I only need to know a url path to use as a functionality check. Is the root: /social-networking-library-ws/
OK?
Thank you Andrea, yes it is /social-networking-library-ws/ for the social-networking-library-ws and /gcube-oauth/ for the other service
Can you provide directions to install and configure the two services so that we can automate that part?
- % Done changed from 70 to 90
The provisioning is running.
The scopes list is still missing, the only active one will be /d4science.research-infrastructures.eu
Thank you Andrea. As far as the list of scopes, I think it will need to run on every scope
- Status changed from In Progress to Feedback
- % Done changed from 90 to 100
Ops, I forgot about the other task. Now I added all the listed scopes.
- Status changed from Feedback to Closed
Also available in: Atom
PDF