Project

General

Profile

Actions

Task #10957

closed

Test GS Migration

Added by Fabio Sinibaldi over 7 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
Urgent
Category:
Other
Target version:
Start date:
Jan 17, 2018
Due date:
% Done:

100%

Estimated time:
(Total: 0.00 h)
Infrastructure:
Development, Production

Description

Test layer migration between GeoServer 2.2 and GeoServer 2.10.

A procedure describing the migration process and phase should be produced.

Such process should :

  • migrate layers between postgres 8 and postgres 9
  • migrate layers from GS 2.2 to GS 2.10 (NB point migrated layers to postgres9 DB)
  • update layer metadata on geonetwork.

Subtasks 2 (0 open2 closed)

Task #10955: Provide production geoserver cloneClosedFabio SinibaldiJan 17, 2018

Actions
Task #10956: Clone geoserver.d4science.orgClosed_InfraScience Systems EngineerJan 17, 2018

Actions
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 8.91 MB)