Project

General

Profile

Actions

Support #4977

closed

publishing the "parallelized_STEP1_VPA_ICCAT_BFT_E_Retros" algorithm in the production environment

Added by TAHA IMZILEN about 9 years ago. Updated almost 9 years ago.

Status:
Closed
Priority:
High
Assignee:
Category:
-
Start date:
Sep 08, 2016
Due date:
Sep 12, 2016
% Done:

100%

Estimated time:
Infrastructure:
Production

Description

Could you please publish in the production environment the "parallelized_STEP1_VPA_ICCAT_BFT_E_Retros" algorithm which is currently available within the DevVRE.
The public link to the algorithm is the following jar http://goo.gl/fH4xhd
We would like you to add it in the category "Iccat Eastern Bft Stock Assessment".
Thanks

Actions #1

Updated by Julien Barde about 9 years ago

  • Due date set to Sep 12, 2016
  • Parent task set to #4846
Actions #2

Updated by Gianpaolo Coro about 9 years ago

I have installed the algorithm in the production environment. However, the one algorithm downloaded from the link you provided has a null parameter that I had deleted.
I guess it will not work.

Actions #3

Updated by Gianpaolo Coro about 9 years ago

  • Status changed from New to Feedback
  • Assignee changed from Gianpaolo Coro to TAHA IMZILEN
Actions #4

Updated by Pasquale Pagano almost 9 years ago

  • % Done changed from 0 to 100
Actions #5

Updated by Leonardo Candela almost 9 years ago

  • Status changed from Feedback to Closed

I assume the ticket can be closed, the algorithm is in the VRE

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 8.91 MB)